Promise Technology VessRAID 1000s Series Manuel Page 223

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 462
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 222
Chapter 5: SmartNAVI
203
NAS Management
This category includes the following topics:
Restarting the Subsystem (page 203)
Powering Off the Subsystem (page 203)
IShutting Down the Subsystem (page 204)
Restarting the Subsystem
To restart the subsystem:
1. Click the NAS Management icon at the top of the screen.
The Shutdown icon at the bottom of the screen is automatically selected.
2. Click the Restart option button.
3. Click the OK button.
When the controller restarts, your SmartNAVI connection is interrupted.
4. Monitor the subsystem in the Device List.
When the subsystem icon changes from gray to blue , click the
subsystem to display it in SmartNAVI.
Powering Off the Subsystem
This option enables you to power on the NAS from SmartNAVI.
The Wake on LAN option must be enabled.
See “Making Management Port Settings” on page 83 or page 248.
The NAS must be in a powered off state.
Vue de la page 222
1 2 ... 218 219 220 221 222 223 224 225 226 227 228 ... 461 462

Commentaires sur ces manuels

Pas de commentaire