Promise Technology E610s Manuel Page 136

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 434
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 135
VTrak E-Class Product Manual
118
Starting Up After Shutdown
To start the RAID subsystem:
1. Manually turn on the power supply switches on the back of the subsystem.
2. Wait about two minutes.
3. Open your browser and log into WebPAM PROe.
See “Logging into WebPAM PROe” on page 54.
If you cannot log in, wait 30 seconds and try again.
Monitoring the Startup
To monitor a startup, you must use the Command Line Interface (CLI) though a
serial connection to the VTrak.
When the Login: prompt appears, the start up is finished.
Important
If you have a JBOD Expansion, always power on the JBOD
subsystems first. Then power on the RAID subsystem.
Vue de la page 135
1 2 ... 131 132 133 134 135 136 137 138 139 140 141 ... 433 434

Commentaires sur ces manuels

Pas de commentaire